progress chart

英 [ˈprəʊɡres tʃɑːt] 美 [ˈprɑːɡres tʃɑːrt]

网络  进度表; 进度图; 工作进度表

化学经济



双语例句

  1. Last month a group of four international bodies, including the World Health Organisation ( WHO) and the World Bank, said China was one of ten countries to have made exceptional progress in reducing infant and maternal mortality ( see chart).
    上个月,包括世界卫生组织和世界银行在内的四大国际组织称,世界有十个国家在降低婴儿死亡率和产妇死亡率方面成就卓越,中国即其中之一。
  2. I'd like everyone to mark their progress on the chart every week.
    我希望每人每周在表上记录进展情况。
  3. Show the progress achieved by reference to a revised time chart.
    根据已修改过的时程图展示已达成的进度。
  4. One key way I track my progress is through my Resolutions Chart.
    跟踪进步的一个关键是通过我的决议图。
  5. To create a visual representation of the progress of your project, you can display progress lines on your Gantt chart.
    若要以可见方式表示项目的进度,请在“甘特图”上显示进度线。
  6. With the arrival of the 21st century, the development of social economy, the progress of medical technology and the change of disease chart and population chart challenge health care.
    随着新世纪的到来,社会经济的发展,人口谱、疾病谱的变化,医学科学技术的进步,向医疗卫生保健事业提出了挑战。
  7. Laying and improving continuously the construction progress chart, thus controlling effectively the construction progress;
    制定并不断完善其施工进度总图,有效地控制了工期的进度;
  8. The humanized periodical supervising mechanism, including progress chart, advice and warnings.
    人性化的定期学习督促机制,包括进度提示、建议、警告等;
  9. On these basis, the generation algorithms of progress graphics is studied, and the generation algorithm of Gantt chart in SVG format is designed and implemented with JavaScript language on the client side to make full use of the processing power of the browser of the client-side.
    在此基础上,对进度图形生成算法进行研究,设计出SVG格式甘特图的生成算法,并运用JavaScript语言在客户端实现算法,以充分地利用客户端浏览器的处理能力。
  10. In the progress of the schedule management, people need to use the "Gantt chart"," network map", "column graph"," line graph "and other progress graphics to visually express the progress information.
    在进度管理的过程中,需要利用甘特图、网络图、柱形图、折线图等进度图形可视化地表达进度信息。
  11. The progress of the project management requires dynamic monitoring using Gantt chart comparison method, timely monitoring of the actual progress of the project, from the organization, management and technical, to take appropriate measures to ensure the control of the progress of the project.
    项目进度管理需要动态监控,利用甘特图比较法,及时监测项目实际进度,从组织上、管理上和技术上,采取相应措施,保证项目进度控制。